Mitsubishi CC-Link, CC-Link IE and MELSECNET Networking, New Zealand

Mitsubishi / CC-Link, CC-Link IE and MELSECNET

CC-Link and CC-Link IE are different networks that share a name. One runs on shielded twisted pair, the other on Ethernet cable. And CC-Link IE running on Ethernet cable is not Ethernet: an ordinary office switch degrades it.

Mitsubishi networking is where most CC-Link and MELSECNET enquiries come from in New Zealand, usually on imported packaging and process machinery that has been extended over the years.

Request a quote

The network families

Establish which one you have before anything else, because the modules do not cross over.

Network Physical layer Used for
CC-Link Shielded twisted pair, RS485 style Remote I/O, drives, remote devices
CC-Link IE Field Ethernet cable, gigabit Remote I/O, drives, servo, vision
CC-Link IE Control Optical fibre Controller to controller
CC-Link IE TSN Ethernet cable Current generation, motion and I/O together
MELSECNET/H Optical fibre or coaxial Controller to controller, legacy
Ethernet Ethernet cable SCADA, MES, general TCP/IP

The IE in CC-Link IE stands for the Ethernet-based generation. Plain CC-Link is the older twisted pair network and it is still extremely common, because it works and nobody replaces a working network.

A CC-Link module and a CC-Link IE module are not alternatives. Different network, different cable, different configuration.

Master, local and remote

The role decides the part, and on Mitsubishi the role is often one character.

Role What it does
Master Runs the network. One per network
Local A PLC station on someone else's network
Remote I/O A block of I/O with no CPU
Remote device A drive, inverter or intelligent device on the network

On the FX range the trailing M is the master. An FX3U-16CCL-M is a CC-Link master and an FX3U-64CCL is a slave. One character, and they sit at opposite ends of the network.

On the Q range the module number changes instead, and a QJ71 module is master or local where a QJ72 is a remote station.

Q series network modules

Module Network Role
QJ61BT11N CC-Link Master and local. Set by configuration
QJ71GF11-T2 CC-Link IE Field Master and local
QJ71GP21-SX CC-Link IE Control Optical
QJ71LP21-25 MELSECNET/H Optical fibre
QJ71BR11 MELSECNET/H Coaxial
QJ71E71-100 Ethernet TCP/IP, 100 Mbit/s
QJ72LP25, QJ72BR15 MELSECNET/H Remote I/O station

The optical and coaxial trap

The most expensive single mistake on this range.

QJ71LP21-25 is optical fibre and QJ71BR11 is coaxial. Both are MELSECNET/H, both sit in the same rack slot, and both are configured the same way in software.

They are not interchangeable, because the cable in the plant is one or the other. There is no adapter.

Look at what is plugged into the front. Two fibre connectors means LP; a single coaxial connector means BR. Send a photo of the module face if you are unsure, and it settles in seconds.

QJ71 against QJ72

QJ71 modules go in a rack with a CPU. QJ72 modules go in a remote rack with no CPU.

So a QJ72LP25 is the head of a remote I/O drop, taking its instructions from a master elsewhere. Ordering one to fix a remote drop is right; ordering one to add a drop to a system with no master is not.

iQ-R network modules

Module Network
RJ71GF11-T2 CC-Link IE Field
RJ71EN71 Ethernet and CC-Link IE, combined
RJ61BT11 CC-Link
RJ72GF15-T2 CC-Link IE Field remote head

The R prefix is iQ-R and the Q prefix is Q series. The functions map across but the modules do not fit each other's racks.

The exception is an RQ extension base, which lets Q series modules run on an iQ-R system. That is the staged migration path, covered on our Q series page.

FX series network modules

Module Network Role
FX3U-16CCL-M CC-Link Master
FX3U-64CCL CC-Link Slave
FX2N-32CCL CC-Link Slave, earlier generation
FX2N-16LNK-M Earlier link network Master
FX3U-64DP-M PROFIBUS DP Master
FX3U-32DP PROFIBUS DP Slave
FX3U-ENET-ADP Ethernet Left side adapter

Note the ENET-ADP is a left-side adapter, not a right-side block. That distinction runs through the whole FX range and is explained on our FX page.

CC-Link remote I/O

The blocks that hang off a CC-Link network, and where most of the volume sits.

Prefix What it is
AJ65SBTB CC-Link remote I/O, screw terminal
AJ65VBTCU CC-Link remote I/O, connector type
AJ65BT Earlier CC-Link remote I/O
NZ2GF CC-Link IE Field remote I/O
NZ2GFCF CC-Link IE Field intelligent modules
NZ2EHG CC-Link IE compatible Ethernet switches

Screw terminal against connector is a wiring decision

An AJ65SBTB lands field wiring on screw terminals. An AJ65VBTCU uses connectors. Same network, same function, entirely different termination.

So they are not substitutes on an existing machine. The connector types were chosen at build time and the loom matches one or the other.

Tell us which the existing block is, or send a photo of the front, and we will match it.

AJ65 against NZ2GF

AJ65 is CC-Link and NZ2GF is CC-Link IE Field. Different networks. An NZ2GF block will not join a CC-Link network and an AJ65 block will not join a CC-Link IE network.

Check what the master module is before ordering remote I/O.

The CC-Link cable and terminator problem

The most useful troubleshooting content on this page, because the symptoms are intermittent and get blamed on hardware.

Terminating resistors are not optional

A CC-Link network needs a terminating resistor at each end of the trunk, and the value is matched to the cable type in use.

Fault Symptom
Terminator missing Intermittent station dropouts, usually the far end
Wrong value fitted Same, and harder to find
Terminator fitted mid-run After a station was removed and the trunk reconnected

This is a very common finding on a network that has been extended or had a station removed. Somebody reconnected the trunk and the terminator ended up in the wrong place, or came off entirely.

It costs nothing to check and it is not a hardware fault.

Cable versions matter

CC-Link specifies dedicated cable, and there are version generations of it. Mixing cable versions on one trunk, or substituting ordinary shielded twisted pair, reduces the reliable distance and the achievable speed.

A network that works at low baud and fails when someone raises the speed is usually a cable problem, not a module problem.

The same applies to the total trunk length and the drop lengths, which are both limited and both get exceeded quietly as a machine is extended.

Station numbers and occupied stations

Worth knowing before adding anything to a working network.

Each CC-Link device occupies one or more station numbers, depending on how much data it exchanges. A 64-point I/O block occupies more than an 8-point one.

Consequence
A network can run out of stations before it runs out of physical connections
Replacing a block with a higher point count can push the network over the limit
Station numbers are set on the device and must not duplicate

So a like-for-like replacement is safe and an upgrade may not be. Tell us what you are adding and to what, and we will flag it.

CC-Link IE runs on Ethernet cable and is not Ethernet

The point that catches IT-minded people and costs a day.

CC-Link IE Field uses standard Ethernet cable and connectors, and a deterministic token-passing protocol on top. It is not TCP/IP traffic that a switch can treat as ordinary data.

Device On a CC-Link IE segment
CC-Link IE compatible switch Correct. Designed for the protocol timing
Ordinary office switch Degrades or breaks the network
Unmanaged industrial switch Not a substitute either

The failure is not clean. The network often comes up and then suffers timing errors and station dropouts under load, which sends people looking at modules and cables.

Mitsubishi supplies compatible switches in the NZ2EHG range for exactly this reason.

Same class of trap as putting a switch into an EtherCAT line, covered on our Beckhoff junctions page. Ethernet cable and RJ45 connectors do not mean Ethernet rules apply.

Star and line topology

CC-Link IE Field supports line, star and ring topologies. A line topology needs no switch at all, because devices daisy chain through two ports.

So if a machine has no switch and the network works, nothing is missing. And if someone adds a switch to a working line topology, that is where to look when it stops behaving.

Where the configuration lives

Item On a replacement module
Network parameters In the PLC project, not in the module
Station number Set on the device, by switch or by configuration
Baud rate Set on the device on CC-Link
IP address, on Ethernet modules In the project

So a network module is a straightforward spare, and a remote I/O block needs its station number set.

That second point is where a swap goes wrong. Note the switch settings on the old block before it comes off the wall, or photograph them.

Before ordering a replacement

Symptom Check first
Far stations dropping out intermittently Terminating resistors. Both ends, correct value, correct position
Network fails after speed increase Cable version and total trunk length
Station dropouts after adding a block Occupied station count against the network limit
Two stations conflicting Duplicate station numbers
CC-Link IE unstable under load Whether an office switch has been fitted
New module will not communicate Optical against coaxial on MELSECNET/H
Remote block dead after a swap Station number switches on the new unit

What to send us

The full module number. It carries the network and the role.

Which network it sits on. CC-Link, CC-Link IE Field, CC-Link IE Control, MELSECNET/H or Ethernet.

What the master module is, if you are ordering remote I/O.

Screw terminal or connector, on an AJ65 block.

Optical or coaxial, on MELSECNET/H. A photo of the module face settles it.

What you are adding and to what, for the station count.

A photo of the rack and of the remote blocks. Mitsubishi labels the front clearly.

What we can supply

Current production. iQ-R RJ71 network modules, CC-Link IE Field remote I/O in the NZ2GF range, NZ2EHG compatible switches, and CC-Link IE TSN hardware. Quoted with a delivered lead time.

Discontinued and mature. QJ61BT11N, QJ71GF11-T2, QJ71GP21-SX, QJ71LP21-25, QJ71BR11, QJ71E71-100, QJ72 remote heads, AJ65 and AJ65SBTB remote I/O, FX2N and FX3U CC-Link and PROFIBUS modules. Surplus and tested used.

Cable, connectors and terminators. The small parts that are usually the actual fault.

Network modules are good spares

Worth stating, because it is not true of every part of a Mitsubishi system.

The network parameters live in the PLC project, so a like-for-like module goes in and works. No laptop, no configuration session.

The one thing to hold alongside them is a set of terminators and a length of the correct CC-Link cable. Both are cheap and both are what fixes the faults people order modules for.

We buy Mitsubishi network hardware

CC-Link and MELSECNET modules hold real value, because a plant still running the network cannot get them new and a like-for-like part avoids touching a working system.

Keep remote I/O blocks with their connectors, and keep terminators and dedicated cable. The accessories are worth more than people expect. See Sell To Us.

Common questions

Can you get a part that is not listed on your site?
Usually. The site shows what we hold, not what we can source.

Is CC-Link IE just CC-Link on Ethernet?
No. Different network entirely, and the modules do not cross over.

Can I use an ordinary switch on CC-Link IE?
No. It needs a compatible switch, or a line topology with no switch at all.

Is a QJ71LP21 the same as a QJ71BR11?
No. One is optical fibre and one is coaxial. Same network, different cable.

Why do my far stations keep dropping out?
Check the terminating resistors before anything else. It is the most common cause and it costs nothing to look.

Do you supply used equipment?
Yes, where new is not available, tested and clearly described.

What is the lead time?
Ex stock items ship the next working day within New Zealand. We give you a firm lead time with the quote.

Do you quote in NZD?
Yes, in NZD including GST for New Zealand customers.

Related

Mitsubishi overview, MELSEC Q series, MELSEC FX, GOT terminals and MELSERVO MR-J.

For industrial networking from other brands see Siemens SCALANCE, Allen-Bradley Stratix, Schneider ConneXium, Phoenix Contact Factoryline and Beckhoff junctions and switches.

Send us your part numbers

Tell us which network the part sits on. And if stations are dropping out, check the terminators before ordering anything. Quotes in NZD including GST.

Request a quote


Industech is an independent supplier of new, surplus and used industrial automation equipment. We are not an authorised distributor of, approved by, sanctioned by, or affiliated with Mitsubishi Electric. MELSEC, MELSECNET, MELSERVO, GOT, GX Works and iQ-R are trademarks of Mitsubishi Electric Corporation. CC-Link, CC-Link IE and CC-Link IE TSN are managed by the CC-Link Partner Association. PROFIBUS is a trademark of PROFIBUS Nutzerorganisation. All trademarks, brand names and part numbers are the property of their respective owners and are used here for identification purposes only.

New

With a great range of the top brands, make us part of your next project.

Asset realization

Ask us about our asset realization program to turn your unused spare parts into cash instead of letting them collect dust on the shelf.

Legacy equipment

With our professional expertise, we can help you source and acquire those elusive legacy parts at competitive prices.

What Makes Us Different?

We make it our business to understand your business

We take the time to understand your needs and goals for your plant or project, with reliability and longevity as our top priorities.

Ethical Pricing

At Industech, we take pride in our ethical pricing structure, ensuring you receive the best value we can offer.

We supply new, surplus and cost-effective alternatives from major industrial brands including:

  • IFM
  • Siemens
  • Lenze
  • B&R Automation
  • ABB
  • Rockwell Automation (Allen Bradley)
  • Schneider Electric
  • Berger Lahr
  • PILZ
  • Sick
  • Emerson Electric
  • Festo
  • Beckhoff
  • Omron Corporation
  • General Electric (GE)
  • Banner
  • Keyence
  • HBM and so much more.

Maximizing Efficiency with Industry-Leading Automation and Monitoring Spares for Your Business

We take pride in providing professional, reliable, and cost-effective alternatives to new automation and control parts from all major brands.